Last month I was feeling so optimistic about The Front Room
Project. I felt like I really
accomplished a lot of work during the month.
Even more, I was feeling really motivated to finish the cleaning so I
could get more into the design component of the project. As you can tell from the title of this
month’s blog, I have lost that optimism.
I do not feel like I made nearly as much progress this month as I had
wanted. I had things going on every
single weekend in June which really limited my ability to spend much time on the
room. July is not going to be any better
because it is the quarter close at work, and we all know by now that I never
accomplish much during that time period.
I set my goal for the end of the year, but I am beginning to wonder if I
will actually make it. At least I keep
moving forward, however slowly it might be.
Below is a brief update on the room as of July 1st. I also included the comparison pictures, June
1st on the left and July 1st on the right.
Overall, the room looks cleaner this month than last month,
especially on the living room side. I
moved a lot of the boxes and debris out of the way so we could start the
painting. Most of the stuff that was
moved has been piled in the master bedroom or my stepson’s room. It all has to eventually go back into the
front room when it is complete. The first
few sections of the walls (the big front wall and some smaller sections by the
closet and stairs) have been painted. I
picked the color Blue Bird Day from my samples, and I am extremely happy with
my choice. Even just having that small
section completed makes the room look so much brighter. My husband is really responsible for this
portion of the project. He patched,
puttied, and sanded any imperfections in the walls. Then, he painted. He also replaced those awful metallic outlet
covers and light switches with white ones that blend into the wall better.
In July, I am hoping that we will finish the painting. Since my husband is doing most of the work
and is not affected by the quarter close, we might make some progress on this
part of the project at least. We still
have two big walls and a few smaller sections by the stairs to finish in the
Blue Bird Day. The ceiling needs to be repainted,
just a basic white. The base boards and the
doors will all be repainted the same glossy white they currently are. He plans to finish swapping all the light
switches and outlets in the room. He
also is going to replace the doorbell chime, the smoke detector, and the light
fixture by the front door. Then, his
part will be done. By the end of the
month, I may have the time to put some work into the room. I imagine I will mostly be moving boxes back into
the room from my stepson’s because I feel bad taking up all his space. My next real task is to make some furniture
decisions, particularly on the office space area.
That is it for this month’s update. I will be back next month, and hopefully I
will at least have some kind of progress to report, even if it is all my
husband’s doing. Wish me luck with the
quarter close, so I can get through it and back to the fun part of life.
See you next week!